REQUEST FOR QUALIFICATIONS AND PROPOSALS TO PROVIDE PROFESSIONAL SERVICES FOR THE SANTA BARBARA AIRPORT RUNWAYS 15L-33R & 15L-33R, PAVEMENT REHABILITATION AND AIRPORT SECURITY FENCE PROJECTS
Introduction & Project Description
The City of Santa Barbara is requesting Statements of Qualifications and Proposals from
engineering firms to perform planning, design, and services during construction for
rehabilitation of general aviation runways, and construction of a new security fence at the
Santa Barbara Airport (SBA).
The runways have not had any major maintenance in 10-15 years and are in need of
rehabilitation. It is expected that the rehabilitation will include a variable depth grind and
overlay. As part of the runway work. SBA also wishes to address a problem incursion area
at the intersection of RW 15L-15R, Taxiway C and Taxiway B. This area needs to be
studied and options need to be developed that would make the intersection look more like
a conventional runway taxiway intersection. SBA expects that this would be accomplished
by removing pavement that is not really necessary.
A major creek runs through the Air Operations Area (AOA), and maintenance of this creek
s causing security issues for SBA. The creek is dredged annually by the County of Santa
Barbara, and maintaining secuhty during the dredging process is a burden to Airport Patrol
stall. SBA wishes to relocate existing AOA fencing, such that the creek dredging operation
would be outside of the AOA and lesser security requirements would apply.
The estimated construction cost of all proposed improvements is in the range of $2.5
million. The project locations are shown on the attached Exhibits A and B.
Fiesta Mural
Artist: Channing Peake
California Cubist, Modernist & Muralist 1910-1989
Rotunda Floor Mosaic
Artist: Lori Ann David
LoriAnnDavid.com
Wood Beam Stenciling
Artist: Vidya Gauci
Vidya Gauci Decorative Fine Arts
VidyaGauci.com
Wrought Iron Railing
Artist: Colleen M. Kelly
ColleenMKelly.com
© 2013 Santa Barbara Airport. All rights reserved.